Sign In | Join Free | My benadorassociates.com
benadorassociates.com
YIXING JIANHUA WATER TREATMENT CO.,LTD
water supply treatment system:filter,Reverse Osmosis water treatment system,ultra filtration water treatment, Ion Exchanger System,they are used in power supply,chemical industry,metallugy industry
Home > sewage treatment >

painting workshop Exhaust Gas absorption tower, Plastic Processing Workshop

painting workshop Exhaust Gas absorption tower, Plastic Processing Workshop

Brand Name : jianhua
Model Number : LXS
Place of Origin : cn
MOQ : 1
Price : 2000
Payment Terms : T/T
Supply Ability : 100pcs
Delivery Time : 7
Packaging Details : wooden
Contact Now

painting workshop Exhaust Gas absorption tower, Plastic Processing Workshop exhaust gas purification tower, workshop waste gas treatment system

Purified by acid mist exhaust duct into tower, after the packing layer, the waste gas with sodium

hydroxide absorption liquid gas liquid two phase fully contact the neutralization reaction, acid

mist exhaust after purification, then through mist plate after dehydration mist fan by the

atmosphere. The absorber is sprayed on the top of the tower after being pressurized by the water

pump, and then it is recycled back to the bottom of the tower. After purification, the acid mist

exhaust emissions meet the emission requirements of local emission standards , which is below

the national emission standard.

As a mass transfer device for the two-phase contact member of the air liquid. Packing support plate is installed in the bottom of the packing tower and the packing is placed on the support plate in a random pile. The packing gland is mounted on the top of the packing to prevent the air flow from rising. Spray column spray from the top of the tower is sprayed onto the packing by liquid distributor and flow down the surface of the packing. The gas is fed from the bottom of the tower. After the distribution of the gas distribution device, the liquid will flow upstream through the interstice of the packing layer, and the liquid will be transmitted in close contact with the air liquid on the surface of the packing. When the liquid flows downward along the packing layer, the wall flow phenomenon sometimes occurs, and the wall flow effect causes the distribution of the gas liquid in the packing layer, thus reducing the mass transfer efficiency. Therefore, the packing layer in the spray tower is divided into two sections, and the intermediate redistributing device is set in the middle and sprayed onto the lower layer of filler after redistribution

YIXING JIANHUA WATER TREATMENT CO.,LTD

PHONE:0086-510-887996211,FAX:0086-510-87996211

http://www.yx-filter.com

Mobile phone:0086-13812211043

EMAIL:wo12883@126.com

SKYPE:mary.wang955


China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

painting workshop Exhaust Gas absorption tower, Plastic Processing Workshop Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: YIXING JIANHUA WATER TREATMENT CO.,LTD
Subject:
Message:
Characters Remaining: (0/3000)